Wednesday, September 03, 2008

New kitchen – day 12

Day 12. 9.30am. Housemate Marie cleans the floor using the new vacuum cleaner they bought from Argos the night before.

The Housemates start work on the worktops. They both come to the conclusion that solid wood worktops are mighty heavy….

4.50pm. The Housemates finish attaching two of the four worktops to the base units.

7.50pm. The fourth worktop has been cut to size, a hole made for the Belfast sink and had two coats of oil on it. As they are both filthy, they decide to call it a night.

1 comment:

Anonymous said...

The housemates are doing very well. Are they scheduled to finish this Friday, alongwith another bunch of far less industrious housemates?

Jenny