Sunday, November 04, 2012

New roof

Shortly after we moved into our house we build a garage at the back of the house. Who needs to use a trowel when bricklaying – that’s what’s fingers are for !!!

Over the years the wind, rain and the snow have taken its toll on roof. When it rained you had to pick your way very carefully in the garage to avoid stepping into the huge puddles.
At the beginning of the year John had to do an emergency repair to the roof as the strong wings began lifting the roof panels. One panel broke off and ended up down the back lane. Thankfully John had kept some spare panels so was able to do a patch up repair but what it really needed was a new roof.

So…..









Maxi/Ruby (they both look alike) inspecting the new roof….

Marie

Sunday, September 12, 2010

New bathroom – part 8

Today John did tiling, tiling, some more tiling and finally a bit more tiling....

It’s only a small bathroom but there’s a lot of tiling to do!!!

Marie

Saturday, September 11, 2010

New bathroom – part 7

John made really good progress with the bathroom today.

Out went the old vanity unit and the last lot of tiles and in came three new wall units and another row of tiles.

Marie

Friday, September 10, 2010

New bathroom – part 6

Today has been one of those days where little bitty jobs seem to take forever so I’m afraid there hasn’t been a lot of progress with the bathroom.

I’m pleased to report that John’s got the bath fully plumbed in and working.

His arms though looks like he’s been self harming himself as they are covered in lots of cuts.

Marie

Thursday, September 09, 2010

Rest day

Because today is my birthday, we thought it would be an ideal time for John to have a day’s rest from working on the bathroom.

As usual the Birthday Bunny was extremely generous so I got lots of lovely presents. We went out for our usual birthday lunch at the Chinese restaurant which was yummy as always….

We’ve been getting requests for pictures of the new bathroom so here’s where we're up to at the moment.



The old radiator is out and tiles in for the new towel radiator




Pipework in




And so is the new radiator




This is where the bath used to be




And here is the new one being manhandled into the bathroom





And here it is, all ready to connect



Marie

PS To the person who sent me the tall birthday card, many thanks. You sent me a blank card so I don’t know who it’s from….

Wednesday, September 08, 2010

New bathroom – parts 4 & 5

Our internet connection was down last night so I wasn’t able to put up ‘part 4’.

Yesterday John finished the shower pluming and nearly all the tiling around where the shower/new bath are going.

Today the final bit of tiling and grouting around the shower/bath were completed and the new bath put into place.

Marie

Monday, September 06, 2010

New bathroom – part 3

John got some more tiling and the grouting done.

The electrical cabling and pipe work for the new shower is also sorted.

It’s coming along nicely…

Marie

Sunday, September 05, 2010

New bathroom – part 2

John made quite a bit of progress on the bathroom today.

Because the shower is now going to be fitted on the wall which used to have the towel rail on, John had to remove ¾ of the wall for the pipes and the electrics to hidden by the new tiles.

Instead of using a mallet and a chisel, which is the normal way to remove a wall, he used a pair of scissors !!!! The wall wasn’t made of brick, it was plasterboard…

Once the wall was removed, John then set to work on some of the tiling. As that is my speciality, whilst I couldn’t physically help, I gave him my expert advice and words of wisdom…

And yes, we are still speaking to each other !!!!

Marie

Saturday, September 04, 2010

New bathroom – part 1

Because our bathroom was getting a little past its best, and not really ‘Marie’ friendly, we decided it was time for out with the old and in with the new.

So today John started by removing the old bath and the tiles.

Sadly due to all things medical I’m having to watch from the sidelines. However I did have my uses – my stairlift came in very handy for getting the broken tiles down stairs….

Marie

Sunday, September 07, 2008

New kitchen – day 16

Day 16. 9.30am. The Housemates are still in bed… As this is the final day of the kitchen fitting they decided to have a bit of a lie in.

11.30am. The Housemates having been to B&Q for some bits and pieces set to work on finishing off the pelmet.

12.30pm. The Housemates make a start on the putting together the remainder of the drawers. They stop to have lunch and watch the start of the Grand Prix.

2.15pm. Having fitted the drawers, the Housemates then start building the dresser unit.

4.pm. The Housemates finish attaching the front to the pulley-out unit.

4.45pm. The Housemates fit the final end panel.

5.15pm. Housemate John tries to fit the sink waste pipe to the Belfast sink but it won’t grip. Housemate John say’s ‘oh dear’….

6.pm. Housemate John gets to work on fitting some of the decorative stripping while Housemates Marie finishes off the grouting.

6.45pm. The Housemates bring back into the kitchen the dresser.

7.pm. The Housemates start clearing up the kitchen.

7.45pm. Other than a couple of cosmetic bits and pieces to do, the Housemates have finished the kitchen…

Saturday, September 06, 2008

New kitchen – day 15

Day 15. 9.30am. Housemate John is fitting more plinth while Housemate Marie heads off to get some sandwiches from the Deli, pay the newspapers and get some kitchen sealant from Wicks.

11am. The new fridge and freezer are installed in the kitchen.

11.30am. The Housemates start fitting the dishwasher and extractor fan doors.

2pm. Housemate John begins fitting the cornices, pelmets and end panels while Housemate Marie starts building the drawers.

7.10pm. Having sanded down the wooden work tops, the Housemates give them another oiling.

7.20pm. The Housemates decide to call it a night. Housemate Marie is looking forward to her relaxing bath as she’s a bit stiff and achy while Housemates John goes out to collect a pizza

Friday, September 05, 2008

New kitchen – day 14

Day 14. 9.30am. Housemate John gets back to finishing off laying the flooring while Housemate Marie makes a start on attaching the hinges and drilling handle holes in the doors.

2pm. The Housemates start handing the doors.

5pm. Housemate John starts work on the plinths.

6.45pm. The Housemates call it a night as they have to get food supplies from Morrrisons and their Chinese take-away.

Thursday, September 04, 2008

New kitchen – day 13

Day 13. 9.30am. The Housemates continue where they left off last night by working on fitting the two remaining worktops.

2pm. The Housemates tidy the kitchen floor and give it a good hoover ready to drag in the Belfast sink.

Housemate Marie said there was no way Housemate John was carrying it into the kitchen. She was worried that a) he’ll drop and smash it and b) he’ll give himself a hernia and the kitchen will not be finished ready for a week come Saturday.

3pm. The Housemates start to install the Belfast sink. The both agree that solid wooden worktops are much lighter than a Belfast sink ! ! !

5pm. The Housemates make a start on fitting the flooring.

7.35pm. The Housemates would have liked to have continued with the flooring but they tummies said they would like to be fed…

Wednesday, September 03, 2008

New kitchen – day 12

Day 12. 9.30am. Housemate Marie cleans the floor using the new vacuum cleaner they bought from Argos the night before.

The Housemates start work on the worktops. They both come to the conclusion that solid wood worktops are mighty heavy….

4.50pm. The Housemates finish attaching two of the four worktops to the base units.

7.50pm. The fourth worktop has been cut to size, a hole made for the Belfast sink and had two coats of oil on it. As they are both filthy, they decide to call it a night.

Tuesday, September 02, 2008

New kitchen – day 11

Day 11. 9.30am. Housemate Marie sets to work grouting the tiles while Housemate John finishes off the tiling that was left from yesterday.

12pm. Housemate John finishes off the Belfast sink unit.

3.30pm. The Housemates finish grouting the tiles.

4.30pm. The Housemates get started on cutting the workbenches. Housemate John tries out his new toy – an industrial strength router. It makes a lot of noise and sawdust.

6pm. The Housemates call it a night as they need to go to Morrisons for more food supplies. Then it’s off to find a cheep vacuum cleaner to hoover up the sawdust (Housemate Marie said she was not allowing Housemate John to use the house vacuum cleaner) and then out for dinner.

Monday, September 01, 2008

New kitchen – day 10

Day 10. 9.30am. The Housemates are hard at it with the tiling.

7.20pm. The Housemates decided to call it a night. There’s still a little bit of tiling left but they are both knackered and don’t want to upset the neighbours as the electric tile cutter has been on the go since 9am and it is rather noisy…

Housemate Marie is about to go for a lovely relaxing bath while Housemate John goes and gets a pizza.

Sunday, August 31, 2008

New kitchen – day nine

Day nine. 9.30am. The Housemates decide to have an extra hour in bed so are having breakfast.

10.30am. Housemate Marie is busy tiling while Housemate John is working on the Belfast sink unit.

12pm. Housemate Marie asks if electric sockets are really necessary as she is having real problems tiling round them. Housemate John replies yes.

1.30pm. Housemate John is finishing fastening the Belfast sink unit to the wall. He is a little perplexed as the installation manual appears to have the sink lower down than is required.

Housemate John checked the dimensions of the sink then the dimensions in the manual. It would seem that the manual has printed the dimensions of the sink as 2 ½ inches shorter than it really is . Housemate John expresses exactly what he thinks of the person who wrote the installation manual…

5pm. Housemate John has installed the dishwasher. Housemate Marie gives out a loud cheer…

6.30pm. The Housemate pack up for the night.

Saturday, August 30, 2008

New kitchen – day eight

Day 8. 9.30am. The Housemates are nowhere to be seen. They have left the House to pay the newspapers, get the lottery, buy some sandwiches from the Deli and get some things from the DIY store.

10.30am. The Housemates start work building more base units.

1pm. Housemate John finishes off building the final two base units while Housemate Marie makes a start on the tiling.

Things are not going very well for Housemate Marie. She is making a very slow progress with the tiling due to there being a double electric socket to tile around on the very first row of tiles.

Housemate John was not aware that Housemate Marie knew so many swear words…

2.45pm. Housemate Marie has only managed to put on two rows of tiles. She is not a happy bunny.

4.30pm. Housemate John finishes attaching the base units to the walls. He now makes a start on attaching the workbench upstands.

6.pm. Housemate Marie has now completed eight rows of tiles so she is feeling a little more cheerful. The Housemates decide to call it a night.

Friday, August 29, 2008

New kitchen – day seven

Day 7. 9.30am. Housemate John sets to work on grouting the tiles above the wall units. Housemate Marie can only watch as she’s not good on ladders, and anyway she wouldn’t be able to reach as she’s not very tall…

Housemate Marie was though able to help Housemate John construct the Belfast sink unit. The Housemates have had to redesign the unit as they wanted a Belfast sink but Wicks didn’t do a Belfast sink unit in the range they chose.

1.30pm. Housemate John cleans the tiles as the grout has now dried.

3pm. The Housemates set to work attaching the corner base unit and the pulley-out cabinet base unit together and to the wall.

4pm. Housemate John starts work on the plumbing for the Belfast sink. He makes lots of noise and mess as he has to drill right though the kitchen wall to the yarden.

6.pm. The Housemates call it a night as they have to go shopping for food supplies at Morrisons then get the Chinese take-a-way.

Thursday, August 28, 2008

New kitchen – day six

Day 6. 9.30am. Housemate John starts undercoating the ceiling edging the Housemates put up yesterday, while Housemate Marie heads off to pick up some tiles they had ordered.

Once the undercoat is dry Housemate John puts a coat of paint on the ceiling edge, while Housemate Marie paints the skirting boards.

2pm. Housemate Marie is very excited as the Housemates are ready to start tiling above the wall units and she gets to play with her new toy – an electric tile cutter.

Once the tiling is completed, the Housemates make a start on building the base units.

6.20pm. The Housemates finish for the night and look forward to a pizza and garlic bread.